FLORIDA CERTIFIED GENERAL CONTRACTOR · CGC1536913(727) 607-8813
Schedule a Consultation
Menu

JAS BUILDERS / education

Why the existing slab changes the lifting plan.

A slab-on-ground home and a framed floor over a crawlspace require different access and support arrangements. The condition and reinforcement of an existing sla

Watch original on YouTube ↗

What to understand

A slab-on-ground home and a framed floor over a crawlspace require different access and support arrangements. The condition and reinforcement of an existing slab must be investigated. JAS takes a conservative approach when evaluating reinforcement and may use substantial engineered steel support to distribute the loads. The lifting plan must respond to the actual building, including additions and floor level changes.

What to ask about your property

What is the existing condition? What further investigation is needed? Which parts of the proposed work depend on engineering, site access or local approval? Bring these questions to the project review.

Written by JAS Builders · Educational overview · Reviewed September 17, 2026. The video is from the JAS video library; this text is an overview, not a verbatim transcript.

Explore the complete house lifting guide →

LET’S START WITH YOUR HOME

What are you
ready to change?

Tell us where you are, what you have, and what you want your home to become.

Schedule a Consultation →Or call (727) 607-8813
Call JASRequest Estimate →