Planning to lift your home before the 2027 hurricane season? Start the paperwork now

By Jeff Trosclair, CEO · November 26, 2026 · 2 min read

Engineering and permits take months before any jacks go under a house. JAS is scheduling consultations now for homeowners who want their lift finished, or well underway, before June 2027.

The 2027 Atlantic hurricane season starts June 1. If you want your home elevated before then, or at least well underway, the time to start is now, not in the spring.

Most people picture a house lift as the day the house goes up. That day is real, and it is impressive to watch, but it is one milestone in a project that usually runs for months. Survey, engineering, plan review and permits come first, and in most Tampa Bay cities that part of the job takes longer than the physical lift.

What happens first

  • A consultation. We look at the house, what you want the finished project to do, and the paperwork you already have: a survey, an Elevation Certificate, old plans or a substantial damage letter from the city if you got one.
  • Engineering. The structural design covers both the finished house and the steps to get there, so the home is supported safely while it is in the air and the temporary steel can come out cleanly afterward.
  • Permits. Building, floodplain and zoning reviews, and sometimes site development and utilities. Plans submitted under the current Florida Building Code before December 31, 2026 are reviewed under that code; after that date the new edition applies.
  • Construction. The lift, the new foundation, utilities, stairs and the final inspections.

Why starting now matters

Permit offices across the region are still busier than they were before Helene and Milton. Every month you start earlier is a month of buffer for plan review comments, utility coordination and weather.

If you are working with a grant program such as Elevate Florida or a city or county mitigation grant, that program has its own steps and approvals, and some of them must happen before any work starts. We can work alongside those programs, but we cannot start grant-dependent work until the program says go.

Talk to us

Call JAS at (727) 607-8813 or schedule a consultation. Bring whatever documents you have. You do not need every one of them to start the conversation.

Watch Jeff explain

Why House Lifting Permits Cost So Much 1:18

From the JAS podcast. See all 18 videos.

Share this story

Comments

No comments yet. Ask a question or share your story.

We read every comment before it shows here.

More from the blog

Get the JAS newsletter

One email a month: Elevate Florida updates, flood insurance changes, grants and what we are building. Unsubscribe any time.

Call JASRequest Estimate →